Boiler U 301

Hands-On Firetube and Deaerator Open/Close

3 Days / $2,500.00

All Classes are currently full. Please call for additional dates.

Boiler U 301 is a three-day full experience of opening, preparing, and closing boiler room equipment in the inspection process.

Boiler U 301 Curriculum Includes:

  • Introduction
  • Drain and LOTO
  • Open Boiler
  • Open DA
  • Material List for Inspection
  • Tube and Vessel Inspection, Relief Valves
  • Sight Glass Replacement
  • Refractory Inspection, Patching
  • Burner Inspection/ Air Inlet, Pilot, Etc
  • Waterside Close
  • Hydrostatic Test
  • Fireside Close
  • Warming, Test Limits and Safeties
  • Verify Combustion

Authenticate Your Account

Please select an authentication method.

A verification code has been sent to . This code will be valid for minutes after .

A verification code has been sent to . This code will be valid for minutes after .